Effective price
Also written Effective exchange rate for the hedger · Effective currency price · Net effective rate
The rate a hedger actually ends up with: the price realised or paid in the spot market, adjusted by the payoff on the hedge — added for a receiver, subtracted for a payer.
In plain language
A hedger has two positions running at once. He converts currency in the spot market, and he squares off a derivative. Neither number on its own tells him how he did.
The effective price is the single rate that combines them. It is what the hedge actually delivered.
The workbook builds it as a sum: the effect of the change in the currency price on the underlying trade transaction, plus the effect of the change in the futures price on the futures contract.
One rule decides everything, and it is a rule about signs.
If you are receiving foreign currency — an exporter — a higher rupee rate helps you, so a gain on the hedge is added.
If you are paying foreign currency — an importer — a lower rupee rate helps you, so a gain on the hedge is subtracted from the rate you paid.
Get the sign right and the arithmetic is trivial. Get it wrong and every hedging question in the paper comes out wrong.
How it works
The workbook's own construction (Chapter 5, section 5.2.1). The effective price is the summation of the effect of change in USDINR price on the underlying trade transaction and the effect of change in future price on the currency futures contract.
Step by step for a receiver.
| Step | What to compute |
|---|---|
| 1 | Change on the underlying trade: spot realised minus budgeted rate |
| 2 | Payoff on the hedge: for a short futures position, contracted rate minus squaring-off rate |
| 3 | Add the two |
| 4 | Add the result to the budgeted rate |
Step by step for a payer (section 5.2.2). The workbook is explicit about why this differs: since it is an import payment, a lower USDINR exchange rate would be beneficial for the importer, therefore a positive inflow from the futures contract is reduced from the remittance price.
| Step | What to compute |
|---|---|
| 1 | Rate at which the remittance was actually made |
| 2 | Payoff on the hedge: for a long futures position, settlement rate minus contracted rate |
| 3 | Subtract the payoff from the remittance rate |
What the number is for. It answers one question: was the hedger better or worse off than if he had not hedged? The workbook makes the comparison directly in section 5.2.1 — the futures contract locked in 81.70 whether the rupee depreciated to 83 or appreciated to 80, whereas not using currency futures would have resulted in an effective rate of 83 in the first case and 80 in the second.
Why the answer is the same on both sides. In the export case the workbook shows that a rupee depreciation gives +2.00 on the trade and -1.30 on the futures, while an appreciation gives -1.00 on the trade and +1.70 on the futures. Both net to +0.70. That symmetry is the definition of a hedge — and it is also why a candidate should be suspicious of an answer where the two scenarios differ.
Options change the arithmetic, not the idea. Chapter 5, section 5.3.7.1, works an unwound put position: premium received on unwinding minus premium paid is added to the rate the bank gave, because the exporter is a receiver.
The formula
For a receiver (exporter), working from the budgeted rate:
Effective price = Budgeted rate + (Spot change on the trade) + (Futures payoff)
Equivalently, working from the realised spot:
Effective price = Spot rate realised + Futures payoff
For a payer (importer):
Effective price = Remittance rate paid - Futures payoff
When only part of the exposure is covered:
Effective price = (Unhedged fraction x Spot rate) + (Hedged fraction x Hedged effective rate)
A worked example
1. The exporter (the workbook's figures). A garment exporter budgets at spot 81, sells four-month futures at 81.75, converts at spot 83.00 and squares the futures at 83.05.
| Leg | Working | Effect |
|---|---|---|
| Underlying trade | 83.00 - 81.00 | +2.00 |
| Futures | 81.75 - 83.05 | -1.30 |
| Combined | +2.00 - 1.30 | +0.70 |
| Effective price | 81.00 + 0.70 | 81.70 |
The workbook gives the shortcut too: 83.00 - 1.30 = 81.70.
Now flip the market. Spot at conversion is 80.00, futures squared at 80.05.
| Leg | Working | Effect |
|---|---|---|
| Underlying trade | 80.00 - 81.00 | -1.00 |
| Futures | 81.75 - 80.05 | +1.70 |
| Combined | +0.70 | |
| Effective price | 81.00 + 0.70 | 81.70 |
Same answer. On the full order of 10,000 shirts at USD 100 each — USD 1,000,000 — the hedge delivered Rs 8,17,00,000 either way, against Rs 8,30,00,000 unhedged in the first case and Rs 8,00,00,000 in the second.
2. The importer (the workbook's figures). A pulses importer buys 1,000 tonnes of chickpea at USD 1,600 a tonne — USD 1.6 million. Spot on the contract date is 81. He hedges half with two-month futures at 81.50. At payment, spot is 82.00 and futures 82.05.
| Step | Working | Result |
|---|---|---|
| Futures payoff (long) | 82.05 - 81.50 | +0.55 |
| Hedged half: subtract the payoff | 82.00 - 0.55 | 81.45 |
| Unhedged half | 82.00 | |
| Effective price | (82.00 x 0.5) + (81.45 x 0.5) | 81.725 |
| Cover | Effective price |
|---|---|
| Full cover | 81.45 |
| Half cover | 81.725 |
| No cover | 82.00 |
Note that the importer wanted the lowest number. Full cover won because the rupee moved against him. Had the rupee strengthened instead, the ranking would have reversed — which is precisely what "the hedge removes the upside too" means in rupees.
3. Watch the sign. If a candidate had added the importer's 0.55 instead of subtracting it, the hedged half would read 82.55 and the effective price 82.275 — worse than doing nothing, which is a nonsense answer for a hedge that made money.
Why NISM asks about it
Chapter 5, section 5.2.1 (Combined position of futures and underlying export trade remittance), and section 5.2.2 (the import case, worked as a partial hedge), are where this is taught and computed. Section 5.3.7.1 applies the same logic to an unwound option position. This is the most reliably examined computation in the paper: the question hands you a budgeted rate, a contracted futures rate, a final spot rate and a squaring-off rate, and asks for the effective price. The Chapter 5 numbers — 81, 81.75, 83.00, 83.05 giving 81.70, and 81, 81.50, 82.00, 82.05 with half cover giving 81.725 — are worth knowing as worked answers.
Common exam traps
- Added for a receiver, subtracted for a payer. An exporter adds the hedge gain to the realised rate; an importer subtracts it from the remittance rate. This one rule causes more wrong answers than anything else in Chapter 5.
- A lower effective price is good for an importer and bad for an exporter. The same number is a win or a loss depending on which side you are.
- Both scenarios must give the same effective price in a full hedge. If your two answers differ, a sign is wrong.
- A loss on the futures leg does not mean the hedge failed. In the workbook's export case the futures lost 1.30 and the hedge still worked, because the spot leg gained 2.00.
- Work from the budgeted rate or from the realised spot, not both. 81.00 + 0.70 and 83.00 - 1.30 are the same calculation; mixing them double-counts.
- For a partial hedge, weight the two rates, do not average them blindly — the weights are the hedged and unhedged fractions.
- Effective price is not the futures price. It is the rate the hedger ends up with after both legs, and it will rarely equal either the spot or the futures rate.
Check yourself
1.An exporter budgets at 81, sells four-month futures at 81.75, converts at spot 83 and squares off the futures at 83.05. What is his effective price?
- a)83.00
- b)81.70
- c)81.75
- d)84.30
Show the answer
Answer: (b) 81.70
The effective price would be summation of effect of change in USDINR price on the underlying trade transaction and the effect of change in future price on the currency futures contract.
Underlying trade transaction: Against the budget of 81, the exporter realizes the price of 83 and therefore there is a net positive change of Rs 2.
Futures contract: Against the contracted price of 81.75, the exporter had to square up the contract at 83.05, thus resulting in a net negative change of Rs 1.30.
Combined effect: (Rs 2) + (- Rs 1.30) = + Rs 0.70.
Effective price: 81 (budgeted price) + 0.70 (effect of hedging and underlying trade transaction) i.e. Rs 81.70.
The workbook also gives an alternative route: the effective price is Rs. 83.00 - Rs.1.30 — same answer, arrived at from the realised spot rather than the budget.
Option A is the unhedged outcome. Not using currency futures would have resulted in an effective rate of 83 (in the first case when INR depreciated from 81 to 83).
And the hedge works identically in the other direction. Suppose that the INR appreciated against USD. At the time of converting USD to INR the spot was 80 and the futures contract was wound up at 80.05, the effective exchange rate for the exporter would still be 81.70. This is because while the exporter receives Re.1 less than his budgeted price in the spot market, he also makes a gain of Rs.1.70 (Rs.81.75-Rs.80.05).
The futures contract enables the exporter to lock in a price of 81.70 irrespective of any depreciation or appreciation of INR.
Note that 81.70 is slightly below the contracted 81.75 — the small gap is basis, arising because the futures price at squaring off (83.05) was not exactly the spot (83).
Where this is taught
Free preparation for NISM Series IRelated terms
- Hedge ratioThe number of futures (or options) needed to hedge a position. For one stock with its own futures it is 1:1; for a portfolio against index futures it is portfolio value × beta ÷ contract value.
- HedgingTaking a derivative position that moves opposite to an exposure you already have, so gains on one offset losses on the other and the future rate is locked in at a known level.
- Basis riskThe risk left over after hedging, because the exposure and the contract used to hedge it do not move identically — in size, in expiry date, or in what they are written on.
- Currency futuresA standardised exchange-traded contract to buy or sell one currency against another on a future date at a price fixed today; in India, cash-settled in rupees, USD 1,000 a lot for USDINR.
- Partial hedgeCovering only a fraction of an exposure with derivatives, leaving the rest open — so the effective rate is a weighted average of the hedged rate and the spot rate.
- Protective callBuying a call option to hedge a foreign currency payable: it caps the purchase rate at strike plus premium, while leaving the importer free to benefit if the currency falls.
- Protective putBuying a put option to protect a foreign currency receivable: it sets a floor rate (strike minus premium) while keeping the benefit if the currency rises. Suited to contingent cash flows.
- Contingent cash flowA foreign currency receipt or payment that may not happen at all — an unconfirmed order or an unsuccessful bid — for which the workbook prefers bought options to futures, because the loss is capped at the premium.